🇮🇳 Hariparvat Zone, Ward No. 10 Construction work on the Budhan Sayyad drain, the drain wall, and a culvert over the drain in the Khatikpara and Nala area.
10-07-2026/NAGAR NIGAM AGRA/18-07-2026/37 — Hariparvat Zone, Ward No. 10 Construction work on the Budhan Sayyad drain, the drain wall, and a culvert over the drain in the Khatikpara and Nala area.