🇮🇳 Cost of constructing hanging solar fencing (2.50km) at Chambakkad Tribal Settlement in Chinnar Wild life Sanctuary of Munnar Wild life Division during-2026-2027
02/2026-2027 — Cost of constructing hanging solar fencing (2.50km) at Chambakkad Tribal Settlement in Chinnar Wild life Sanctuary of Munnar Wild life Division during-2026-2027